Production equipment
- H-S machining centers (high-speed machining) for tooling manufacture
- 4 electro-erosion machines
- 8 inertia and hydraulic drop hammers (from 650 to 2000 Kg/m) for forging of parts from
1 gram to 1 kilogram
- Heat treatment furnaces
- 2 automatic, double-action forging lines for large production runs:
Speed: up to 2200
parts per hour
- Mechanical de-burring presses
- Tribofinishing facilities for polishing and finishing of finished parts
- Penetrant inspection: non-destructive testing to check for cracking
- Salt spray testing facility: inspection for corrosion resistance
- Machining and assembly of fittings parts
- Special machines for special products
|
Strict process quality control...
All Wichard forged products undergo a strict process quality control to guarantee the best quality is supplied to customers.
- Spectrographic analysis
- Tensile tests on each lot
- Possibility of individual testing
|